Coordination rejection input

Even if the downstream changes, the responsibility originator of the coordinationRejectioninput must be the consulted responsibility (the responsibility delivered for CONSULTATION). The name of this consulted responsibility can be deduced from the servedController list (distributionKind = CONSULTATION) of the alternative SFPL corresponding to the proposal according to the direction of this proposal (direction = DOWNSTREAM / UPSTREAM). And its identifier is in the ControlSector list.

On a coordinationRejection input:
- The whole set of coordination data is considered rejected by CCS.
- The coordination status of the transition is set to REJECTED.
- The WhatIF flight supporting this coordination dialog is deleted from CCS (the HMI manages itself the removal of the whatIF flights associated with an ACCEPTED/REJECTED dialog in its system).